BIG STABLE LEESBURG-MAIN WAREHOUSE MODIFICATIONS – PHASE II
The project consisted in relocating the equipment and solving the problems of the CCTV surveillance system. Based on this, It was made:
Uninstalled the switch box located on the second floor.
Uninstalled and installed 1,474 feet of Cat5e cable on 6 cameras.
Added 165 feet of PVC duct to the new room located on the second floor.
Installed the switch box and connected all devices (Cameras and Antenna).
BIG STABLE-LEESBURG - PHASE III
In 2016 the main activity consisted of relocating the server rack to the designated room within the main warehouse. In addition, a new camera was installed and added to the system and system problems were solved.
In 2017, as part of the troubleshooting, an antenna and two lightning-damaged SOP switches were replaced and a solar system uninstalled. It also reinstalled two cameras in a main warehouse and realigned five cameras.