Rehabilitation of the transmission lines at 115 KV, Planta Centro- Valle Seco- Bárbula, Planta Centro- Guaparo and Guaparo- San Diego Bárbula, Venezuela. Data control centers NOC 1 and NOC 2, telecommunications equipment, about 1,000 kilometers of optical fiber, videoconference rooms, structured cabling, access control systems.
We substituted 166 fluorescent tube screens and 16 halogen spots with 122 LED panels of 60x60cm, 7 circular LED downlights and 16 LED spots, at the client’s facilities.
Supply and installation of cable with a capacity of 400 MW for the electricity transmission system, for this a laying was made from the coast of Chacopata, from the same cable ship CS Sovereing, to the Punta Mosquito coast, Cable number 3 It also had an optical fiber that made it possible to improve telecommunications on the island. Edo. Nueva Esparta (Venezuela).