Supply and installation of the air conditioning system
Supply and installation of the air conditioning system of 3 buildings, in VRF system. For the development of this project, it was necessary to install ceiling fans, diffusers and return grilles, cassette-type evaporator units and fan coils, insect screens, fresh air intakes and interconnections of the units’ drains to the project’s water collection system.
In order to achieve the due supply and installation of the air conditioning system respecting all the established safety and quality standards, the following objectives were achieved: to comply with the work orders, schedules and times established for the delivery of the work, and to guarantee the correct and optimal operation of the equipment.