Greater Miami Adventist Academy Project

The project consisted in the design, supply and installation of a surveillance system to monitor both the interior and exterior of the school grounds and record data for access by the school’s faculty. To achieve this objective, the following equipment was installed:

35 IP cameras

3 x 16-port NVR

3 x 24-port PoE switches

1 24-port PoE switch

131 1.5 “(10 ‘) PVC conduit

2 PVC couplings of 1.5 “.

4 1.5″ PVC T-piece duct body

14 1.5″ PVC LB duct body

4 monitors

11 CAT6 cables (boxes)

1 server.

Project Details

Categories:
Telecommunications

Client:  
Adventist Academy

Location: 
500 NW 122nd Avenue, Miami, FL 33182 (USA)

Contact Info

Data cabling of the new sixth floor suite of the Bluegreen Millenia building.

The project involved the installation of data cabling in the new sixth floor suite of Bluegreen Millenia’s building. All services, materials, supplies, labor, equipment, superintendence and transfers were provided. Also, a schematic plan of the completed work that included the locations and numbers of all data terminations. The following equipment was installed to meet the objectives:

Leviton CAT5e jacks

Blue for data

Wall plates white/beige

Electrical wall plates.

 4 Leviton CAT5e patch panel

Patch panels separated by 1RU

48 ports.

Project Details

Categories:
Telecommunications

Client:  
Bluegreen Corporation.

 Location: 
Bluegreen Millenia. 4700 Millenia Blvd. Suite 605. Orlando, FL 32839 (USA)


Contact Info

Reset password

Enter your email address and we will send you a link to change your password.

Get started with your account

to save your favourite homes and more

Sign up with email

Get started with your account

to save your favourite homes and more

By clicking the «SIGN UP» button you agree to the Terms of Use and Privacy Policy
Powered by Estatik